Pole Tavern Floor Installation

40scfloor1
The frame was inspected, sanded, primed and painted. Reinforcement was added where it was needed.
formfloor2
A new steel form deck for the floor was installed.
40scfloorframe2
The original floor had to been completely removed. We saved the vintage unglazed mosaic tiles though.
40scfloorframe1
The original rails are visible as well as the added end rails to support the floor deck.
floor1
Two inches of fiber reinforced concrete was laid over the form deck with stainless steel wire mesh underneath.
int62
We upgraded to metal fireproof studs on the kitchen walls.