Roof Reconstruction

joistssideprep
You'll want to watch your step when doing this kind of work. New 3/4 inch
amroofwood3
Plywood was secured to the wood rafters. Insulation was installed as appropriate.
amroofwood4
With an all new 3/4 inch substrate installed we then…
amrooffelt2
…secure 30 lb. roofing felt before the final membrane.
om membrane1 small
Torch down membrane was secured over the roof felt.
om membrane2
Silver elastomeric paint will be applied once the membrane has cured.